Vendor onboarding

Adding Central Property Services to Your Approved Vendor List

This is the paperwork side of hiring us: the documents your credentialing process needs, what we need back from you to issue them correctly, and who signs before anyone starts work.

It is written for the person who has to move a new vendor through a system, not for the person shopping a price. If your file needs a certificate worded a particular way, tell us the wording and we will have it issued that way the first time.

What we send you

Five items cover most credentialing files. No limit, policy number or licence number appears on this page — those belong inside the documents, issued to you, not published on a website.

The vendor packet, and what your process uses each piece for.
Document What your process uses it for How it reaches you
Certificate of insurance General liability, workers’ compensation and commercial auto, issued to the certificate holder exactly as your file words it. Issued by our insurance agent to the holder name and address you give us.
Additional-insured endorsement pages Names the managing entity — not the property — as additional insured. A statement on the certificate is not an endorsement; the ACORD 25 form says so on its own face. Attached behind the certificate. Tell us whether your requirements call for ongoing operations (CG 20 10), completed operations (CG 20 37), or both. They are separate endorsements and they run on the carrier’s clock, not ours.
W-9 Your AP system needs the exact legal name and taxpayer ID to create the vendor record. If the name and the TIN do not match, the record is not approved and no purchase order can be issued against it. Sent to a named person, in reply to your request. Never a public download — it carries a taxpayer ID and a signature.
Licences and local registrations Whatever your file requires for the county the building sits in. Lexington–Fayette County requires contractors to be registered with the city before they work on projects or submit bids; Madison County work runs on its own local requirements. With the packet, on request.
Your vendor agreement, signed The executed agreement or MSA your file needs on hand before a work order is issued. You send yours; we return it signed. We do not ask you to sign ours.

What the packet does not include

  • References or a project list. Central Property Services is a new entity and has no completed contracts under it to offer as references yet. We would rather tell you that than pad a list. If your rubric scores references or past performance pass/fail, say so — we will tell you we do not clear it instead of using up an evaluation.
  • A downloadable W-9 or certificate. Both go to a named person who asked for them. A signed W-9 sitting on an open URL is a fraud vector, not a convenience.
  • A rate card. Work is priced against a defined scope, not off a published table.
  • A date by which your approval will be finished. Endorsements run on our carrier’s clock and approval runs on your process. Neither of us controls both, and a made-up number would be the first thing we got wrong.

One document is open, with no form in front of it: our statement of capabilities (PDF) — one page covering what we take responsibility for, the two counties we cover, and how we run a job. A manager who has to trade an email address for a one-page PDF learns something about how the rest of the relationship will go.

What we need from you

Five answers, and the certificate is right on the first pass instead of the third.

  • Your insurance requirements, as written. We read the document and quote it to our agent word for word rather than guessing at it. Requirements run in both directions — most packets require additional insured status and some forbid it outright, so the document decides, not a convention.
  • The exact certificate-holder wording, character for character, address line included. A holder block that does not match is a rejected certificate and a lost week.
  • Which entity gets named as additional insured. Usually the managing company rather than the property. Your agreement settles it; we do not want to guess.
  • Whether you credential through a platform or take the packet directly. It changes what we send and where we send it.
  • The county each building sits in. Fayette and Madison have different local registration requirements, and the answer decides which applies.

If your packet includes a subcontractor-information attachment, we complete it.

If you credential through a platform

RealPage Vendor Credentialing (formerly Compliance Depot), Yardi VendorShield and VendorCafe, and NetVendor are the systems that come up in property management. Some operators run two of them — one for compliance, one for invoicing — and both have to be finished before a work order is issued. Tell us which you use and we will work inside it.

The enrollment fee is ours. These platforms charge the vendor, per management company, and that cost is not billed back to your properties. It does not appear anywhere in what you pay us.

Approved on a platform is not cleared to work at your property

Corporate credentialing and site authorization are two separate gates, and the second one is where vendors embarrass themselves. We do not read an “approved” status in a portal as permission to show up. Tell us who at the property gives the final go-ahead and we will get that in writing as well.

We will never ask you for a login

Send the invitation to a named person on our side and we will complete the enrollment from there. A vendor asking a property manager to hand over credentials to their own system is asking for the wrong thing, however normal it sounds on a phone call.

Who signs, and what we ask before we start

No purchase order or written work order, no work. That is our own discipline, not a concession we make to a strict client. We would rather hold a job for an hour than send an invoice that turns into a dispute two months later.

It means we ask three things before the first job: who authorizes work at this property, what that person’s approval limit is — so we quote it right the first time rather than writing a number they cannot sign — and how you want the authorization documented. A PO, a work order raised in your system, or an email we can attach to the invoice all work. Asking makes the limit mutual instead of a surprise at the bottom of a bill.

After hours the authorization question changes shape, and it is handled on the emergency and make-safe response page rather than repeated here.

What we take responsibility for

Four lines, listed as scope rather than as a menu. If it is on this list, it is ours to answer for.

Interior repairs and build-out

Partitions, drywall, doors and hardware, finish carpentry, paint. The lane a facilities manager buys most often. Interior repairs and build-out.

Emergency and make-safe response

Water intrusion, storm damage, board-up, securing a building after hours. The authorization note above covers how a call gets approved.

Grounds, lot and exterior cleaning

Pressure washing, striping, debris, snow and ice. Grounds, lot and exterior cleaning.

Building envelope

Gutters, flashing, sealants, masonry patch, siding. Building envelope repair.

What we do not take

Worth reading before it is written into an on-call agreement.

Referred, not taken

  • HVAC, electrical and plumbing. We do not advertise them, sell them, or take responsibility for them. When a call turns out to be one of the three, we say so and refer it rather than accepting the work order and figuring it out later.
  • Anything we cannot stand behind. A capability list longer than what we can actually deliver is not positioning; it is a claim we would have to walk back on your property, in front of your tenant.

Where the roof line falls

If it is the roof surface or a roof system, it is not ours. Gutters, flashing, sealants, masonry and siding — the rest of what keeps water out of the building — are. Roof surfaces and roof systems go to a separate roofing company.

On-call maintenance agreements routinely carry a roofing line item, so it is better settled now than argued about the week it rains.

How we run a job, in writing

Central Property Services is a new entity. There is no project list on this page and no client logos, because nothing exists yet that would honestly belong in either. What does exist is a process, and a process is something you can hold us to today.

  1. Authorization first. Nothing starts without a purchase order, a work order, or written approval from the person you named. We record who authorized it and what they authorized.
  2. Scope in writing before a price. Step by step, with the exclusions listed alongside it. What is not included is stated up front rather than discovered on site.
  3. Change orders before the work, not after. If the scope moves, it goes back to you in writing and waits for a yes. Verbal extras do not appear on an invoice.
  4. Documentation as we go. Condition before, work performed, condition after — kept with the job file and available with the invoice.
  5. The invoice matches the paper. It carries your PO or work-order number and prices the approved scope. If it was not on the approved scope, it is not on the invoice.
  6. Closeout in plain language. What was done, what was not, and anything we saw that you will want in next year’s budget.

What this process does not include

  • Work started on a verbal, at any hour.
  • A price for anything outside the scope you approved.
  • A promised credentialing turnaround. We will start the endorsement request the day your requirements arrive and tell you when the agent confirms — we will not name a date we do not control.

Start vendor setup

Eleven questions. Each one removes a round trip that otherwise costs days of carrier time or approval time. If something does not apply, say so and move on — a half-filled form still gets a real answer.

Call to start the vendor file

There is no intake form here yet, and we are not going to show you one that goes nowhere — you would be waiting on a reply that was never coming. Call, and we will send the packet the same way your credentialing process wants it.

Call (859) 310-1209

Documents go to a named person at your company, not to a public download. Tell us who, and how they want to receive them.

What we will need from you

Most of this is already written down somewhere in your process. Reading it to us once is faster than three rounds of email.

  1. The managing company The exact legal entity name — the one that has to appear on the certificate, not the trading name on the sign.
  2. The property or portfolio Name and address, and whether we are covering one building or several.
  3. How you credential Through a platform, or does the packet come to you directly? If it is a platform, which one.
  4. Your insurance requirements Limits, and whether you need an additional-insured endorsement, primary and non-contributory, or a waiver of subrogation.
  5. Exact certificate-holder wording Read it to us character for character. A certificate naming the wrong entity is the most common reason a vendor file stalls, and it is entirely avoidable.
  6. Who releases work at the property Approval at the corporate level and the go-ahead at the building are often two different people.
  7. How work gets authorized Work order, PO, a standing not-to-exceed, or a phone call you confirm in writing afterwards.
  8. The smallest thing on your list right now A first job that is genuinely small is the fastest way for both of us to find out whether this works.

Richmond & Lexington

Where we work

Madison County — Richmond and the surrounding county. Fayette County — Lexington. Commercial and institutional buildings in both. Service-area business, so there is no walk-in address; we come to the property.

Call (859) 310-1209, or start vendor setup above.

Central Property Services — commercial property maintenance for Madison and Fayette County, Kentucky.

Service-area business. No walk-in address. Insured; coverage documentation available on request. Vendor documents · Request an assessment